Blade repair QA and completion inspection
Repair-stage evidence and visual completion checks against the agreed repair scope, issued method and acceptance requirements.
Keep the repair record clear from the pre-repair condition through agreed hold points to final close-out.
Before commitment, we review the project objective, turbine platform, access constraints, competence requirements and reporting expectations.
- Pre-repair condition documentation
- Verification of repair location and scope
- Photographic evidence at agreed hold points
- Visible completion checks against the issued instruction
- Close-out photographs, measurements and punch-list recording
Service boundary: Formal engineering acceptance remains with the authorised client, OEM or appointed engineering authority unless separately contracted through a qualified specialist.
From first scope review
to a usable close-out record.
Scope review
We clarify the technical requirement, site conditions and the evidence or repair outcome you need.
Project readiness
Before mobilisation, the required competence, access, HSE, rescue, equipment, insurance and instructions are checked for the project.
Field delivery
Work follows the agreed method, scope and hold points, with evidence captured as the job progresses.
Close-out evidence
Findings, repair records, photographs and completion evidence are organised for client review.